What Is The Automation Testing Life Cycle?

0/5 No votes

Report this app

Description

What Is The Automation Testing Life Cycle?

 

Test automation is applied with structural continuity of the test process, which can cover all stages of the test life cycle with additional steps including test preparation and implementation process automation. This whole process is known as Automation Testing Life Cycle. Various stages of ATLC depend upon ‘defining the scope of test automation, type of functionality of automation testing tool selection process, designing the test plan, explanation of the test strategy, establishment of the test environment.

 

Test matters Nominating and scripting, implementing test scripts, verifying test results, and finally preparing test reports. The stage denies decisions that have been made for the feasibility study of the automation testing process. A suggestion should be made, which will have the following assessments: Application modules that can be automated need to identify those that can’t. Important factors need to be identified and considered such as cost of automation tool, size of testing team, and automation process expertise.

 

Feasibility checks should be done before starting automation testing, these include test case automation feasibility and AUT automation feasibility checks. This is phase 2 of the ATM process. It is important to identify the right automation testing tool for the automation testing lifecycle because automation testing highly depends on the tool used. Developers need to consider budget constraints, team resources available as well as team familiarity with automation tools used.

 

The selection of automation tools also depends on the flexibility and flexibility of the team using the tool. Test Engineer should explain and evaluate the pilot test quality of Automation Tool. Then the testing personnel should assess it based on various standards set by the test engineer. This is the next phase of the automation testing lifecycle, including the establishment of a test automation framework. The Testing Team establishes test standards and guidelines.

 

As well as software and hardware and network systems to support the testing environment. It also outlines the preliminary testing schedule, the data requirements of the test and error-tracking system, a relevant tracking tool, and a way to control the configuration and staging environment for the test. Collect all manual test cases from the Test Management tool and identify the test case that needs to be automated. Along with the testing framework, the profession and cons of the testing tool should be identified.

 

Relevant risks, background information, and dependence between copy and device should be mentioned in the test plan Test for automation test case should be made in test management tool. Approval should be sought from stakeholders or clients for the inspection strategy. Production data needs to be same as test environment otherwise it becomes a problem when code changes in production environment. Need to create a checklist of all models, systems and applications for the test.

 

Front-end running environment is essential to be in place to analyze the load testing of the products to handle web traffic. Should be tested in multiple client operating system Tests should be conducted in all browsers and their versions. Establish a staging environment like separate database server. All formation/installation guidelines must be stored in the end user manual in the central database.. To implement the script, the automation testing team must ensure that all scripts are running properly, they need to take notice of the following actions.

 

Test script should be formulated based on actual requirements. To be used throughout the testing process, it is important to develop a common function method. Creating an organized, reusable script is essential so that other team members can easily understand it. Codes should be reviewed for proper quality assurance test scripts.
After all tests are completed, the team analyzes and identifies particular features and components that face several issues in test reports.

 

The analysis identifies any needs for additional tests or procedures.. Analysis of test results can verify if there are errors in the test script or the procedures carried out. This is the final stage of the automation testing lifecycle and all test reports at this stage must be shared with clients or stakeholders.

Leave a Reply

Your email address will not be published.